Artvin Deriner Barajı : Türkiyenin en yüksek barajı!
Deriner Dam Underground Powerhouse Of Turkey
Deriner Baraji ARTVİN İlinin 5 km membasında Çoruh nehri üzerinde.
Yüksekliği: 247 m
Kret uzunluğu: 720 m
PROJENİN AMACI: Enerji (670 MW, 2118 GWh / yıl )
(+)
(+)
(+)
(+)
(+)
(+)
Deriner Dam Underground Powerhouse - Turkey
Location: Coruh River, northeast corner of Turkey, 100 km upstream bordering Georgia
The hydroelectric projects on the Coruh River and its tributaries are a vital resource to help increase Turkey's generating capacity and reduce dependence on imported electricity and coal-fired generation.
THE DAM
Highlight: 2nd highest double curvature concrete arch dam in the world
Dimensions: 254-m high
Average flow: 160 m3/sec.
The spill structures consist of orifices through the dam and a concrete chute spillway on the left bank. As the headwaters of the Coruh River flow through soft volcanic rock, and the steep terrain causes many landslides into the river, it is a very muddy river even during relatively low flow. Deriner Dam will create a 70-km long lake that will allow the silt to settle out of the water and thus provide clean water both in the lake and downstream of the dam. This will be a benefit both for recreation and for the fish in the river.
THE POWERHOUSE
Highlight: 5th largest underground powerhouse in the world
Location: 100 m underground
Dimensions: 120 m long x 20 m wide x 45 m high
Instrumentation: Roctest
4 generating units with a total installed capacity of 632 MW operating under a head of 205 m and generating approximately 2100 GWhr/yr.
129 rock anchors of 20 m long and up to 1400 kN in capacity provided support for the walls of the powerhouse during excavation. Support for the ceiling consists of a heavily reinforced cast concrete arch.
INSTRUMENTATION & DATA ACQUISITION
--------------------------------------------------------------------------------
21 four and five point SAM rod extensometers with vibrating wire sensors for measuring convergence of the ceiling and walls during excavation.
--------------------------------------------------------------------------------
1 tape extensometer to measure the convergence of the powerhouse walls and ceiling.
--------------------------------------------------------------------------------
21 oil-filled total pressure cells to measure the stress changes between the native rock and the arched concrete ceiling abutments.
--------------------------------------------------------------------------------
10 thermometers to measure the cooling rate of the arched concrete ceiling (which was up to 12 m thick at the ceiling abutments).
--------------------------------------------------------------------------------
10 vibrating wire piezometers to measure water pressure between the concrete lining and the native rock.
--------------------------------------------------------------------------------
2 Vibrating Wire Load Cells to measure load changes in the rock anchors.
--------------------------------------------------------------------------------
Senslog 1000X Automatic Data Acquisition System (ADAS) except for temperature guage readings. Five 32-channel multiplexers reduce the amount of cable required.
--------------------------------------------------------------------------------
A very important aspect of the instrumentation program was reliability. The SAM extensometers installed in the ceiling of the powerhouse would not be accessible after installation due to the depth of excavation (up to 45 m). Thus, they had to operate reliably with no opportunity for servicing for a minimum of three years until the internal concrete structure (walls and floors) was installed in the powerhouse.
Convergence of the powerhouse walls can be clearly seen each time a new bench is excavated in the powerhouse. The convergence movements are primarily measured by the SAM extensometers, and are confirmed by the tape extensometer readings and the increase in the load measured in the rock anchors. The embedded total pressure cells measure stresses between the concrete arch ceiling and the bedrock abutments. Clearly visible is the initial reduction of stress due to shrinkage in the concrete shortly after placement, and then increase in stress due to the deepening of the excavation.
TROUBLE FREE
Roctest provided an engineer on site, full-time, for the duration of the powerhouse instrumentation installation and ADAS commissioning program to ensure that the installations were trouble free and the data collection system would operate reliably for this very important project.
DERINER POWERHOUSE
Rows of rock anchors protruding from concrete blocks are visible on the right and left powerhouse walls. The crew is in a basket suspended from the crane, installing a load cell on a rock anchor 26 meters above the powerhouse floor.
|
 |
İlhan
20 yıl önce - Cmt 09 Ağu 2003, 18:48
bitim tarihi 2005 - 2006, Ataturk barajindan cok buyuk bu baraj
En son İlhan tarafından Cmt 09 Ağu 2003, 19:40 tarihinde değiştirildi, toplamda 2 kere değiştirildi
|
 |
Misafir 442
20 yıl önce - Cmt 09 Ağu 2003, 19:41
| VATAN 2003 demiş ki: |
| bitim tarihi 2005 - 2006, Ataturk barajindan cok buyuk bu barac |
Baska olculerini bilmirem, ama kurulu guc bakimindan Ataturk baraji Deriner baraji'ndan kat kat buyuk. Deriner'inki 670 MW, Ataturk baraji ise 2 400 MW. Ayni zamanda, Ataturk baraji yillik 8 900 GWh elektrik uretiyor, Deriner ise, bittiginde, 2 118 GWh uretecek.
Her halde, Turkiye'de yapilan en buyuk barajlar'dan biri. Hayirli ve ugurlu olsun
|
 |
alaman
20 yıl önce - Pts 18 Ağu 2003, 08:01
Deriner Baraji Türkiyenin en büyük baraji degil en yüksek (en yüksek ikinci) baraji olacak.
Beton Kemer olarak en yüksek ama genel yükseklik olarak ikinci.
Cünkü yapilmasi planlanan Yusufeli baraji (Tas+Kil dolgu) 270m (temelden yükseklik 270 m, talvegten yükseklik 230m) olarak planlandi.
Karsillastirma:
Dünyanin en yüksek baraji Tacikistan'da 330m yükseklikte
Avrupanin en yüksek Baraji isvicre'de ve 280 m yükseklikte (Grand Dixence Baraji)
Atatürk Baraji 184 m yükseklikte
Dünyanin en büyük HES: Cin Three Georges Dam 19.000 MW; 95 milyar KWh elektrik üretecek (insaat halinde).
Türkiyenin ekonomik HES potansiyeli 120 Milyar KWh
Atatürk Baraji 8,9 mILYAR kwH
Coruh nehri üzerine yapilmasi planlanin Barajlar üzerine bilgiler;:
http://www.borcka.gov.tr/barajllar/baraj.html
|
 |
Ufuk
17 yıl önce - Sal 21 Mar 2006, 09:38
Diğer barajlarımız %20 kapasite ile çalışırken bu yatırımın sebebini anlayamıyorum. Öncelikle mevcut barajlarımızı gerçek kapasitelerinde çalıştırabilmek için çaba sarfetmeliydik.
|
 |
memoer
13 yıl önce - Cmt 05 Arl 2009, 07:39
bu baraj yapımı bitti mi şu an çalışır vaziyette mi bilgisi olan lütfen.....
|
 |
Kazım Arslan
13 yıl önce - Cmt 05 Arl 2009, 11:30
Bitmemis.. 2010 ortalarinda bitirmek istiyorlarmis.. Ilk hedefin 2005 olarak gösterilmis olmasi, 2010'da bitmeyecegine dair bir isaret midir bilemiyorum..
|
 |
zafer-bey
13 yıl önce - Cmt 05 Arl 2009, 15:09
Mayıs ayında Artvin'deydim, bu barajı da özellikle gittim ve gezdim, şantiye şefi de bize bilgi vermişti. Mayıs ayında çift vardiya halinde 1300 işçi çalışıyordu, işin asıl zor olan kısmının bittiği ifade edildi. Barajın gövdesini oluşturan beton kemerin kalınlığı 55 metre idi ve çok özel beton kullanılmakta, çeşitli termik santrallerden cüruf getirilip, betona katılmaktaymış... Eski yolların baraj sularının altında kalacak olması nedeniyle; Yusufeli yolunun yapımı hızla sürüyordu, Şavşat yolunda yeni yol açılmış ve bazı viyadükler yapılmaktaydı...
İlgili mesajım; http://wowturkey.com/forum/viewtopic.php?t=6439&a ...p;start=10
|
 |
mhkose
13 yıl önce - Cmt 05 Arl 2009, 15:12
Artvine ve ülkemize hayırlı uğurlu olsun..İşte ülkemiz böyle büyük projelerde dünyaya boy göstersin..
|
 |
zafer-bey
13 yıl önce - Cmt 05 Arl 2009, 15:29
Bu baraja ait fotoğrafları daha önce yüklediğimi zannediyordum ama sitede bulamadım, şimdi yüklüyorum...
- Barajın yapımı devam eden gövdesinin uzaktan görünüşü, su biriktirme havzası barajın diğer yönüdür...
(+)
- Barajın bitmesi halinde su ile dolacak olan derin vadi...
(+)
-Barajda çalışna işçilerin bulunduğu kamptan ve aynı zamanda DSİ Bölge Müdürlüğünden barajın görünüşü...
(+)
- Barajın beton kemer gövdesi görünüyor. Dökülen betonun kalınlığı temelde bölgelerinde 55 metre enindeymiş... Yüksekliği ve gövdesi oldukça heybetli bir baraj...
(+)
(+)
|
 |